Day rate vs fixed quote for plumbers (UK)

The same work can be sold as a fixed quote, a day rate or hourly after a call-out. The right shape depends on how well you know the job, not on habit. This page helps UK plumbers choose. It is not a price list for householders.

Fixed quote

Best when you have seen the job and can describe the scope tightly: like-for-like swaps, adding a radiator on accessible pipework, a surveyed basin or WC change.

Build the number from true cost, then check margin. See how to price plumbing jobs.

Day rate

Best when the programme is open or the customer keeps changing the plan: strip-out that may reveal rotten floors, a bathroom where tiling and electrics are still undecided, attending for a builder who will only know the next task each morning.

Derive the day rate from billable hours × your charge-out rate, not from copying someone else's Facebook post. The hourly rate calculator covers that step.

Call-out plus hourly

Best for diagnostics and emergencies. State the call-out, what it includes (for example the first hour), the hourly rate after that, and that parts are extra. Agree it before you leave the van. Use the call-out charge calculator to test whether your fee covers travel and the first block of time.

Worked comparison (example only)

Example only. Same first-fix pipe runs for a small cloakroom, estimated at 7 billable hours. Your customer rate is £55/hour. Your day rate is £400 for up to 8 billable hours on site.

ShapeCustomer pays for labour (ex VAT)Notes
Fixed quote (7 h × £55)£385You keep the gain if you finish in 6 h; you lose if it takes 9 h unless you priced contingency.
Day rate (1 day)£400Fair if the day fills. Weak if you only had half a day's real work and no other job booked.
Call-out £90 (incl. 1 h) + 6 h × £55£420Suits unknown faults better than a fixed cloakroom first-fix.

None of these figures is a recommended market rate. They show how the shape changes who carries overrun risk.

Practical rules of thumb

  1. If you can write a clear exclusion list, prefer a fixed quote.
  2. If the customer cannot decide the suite, electrics or layout, prefer a day rate with a written daily scope.
  3. If you have not opened anything up yet, prefer call-out plus hourly until you can quote the repair.
  4. Always separate materials: either itemised at agreed markup, or "materials at cost plus X%" stated on the quote.

Pick the shape, cost the job, send a clean PDF.

3 quotes free. Then £5/month or £50/year. Cancel anytime.

Try 3 quotes freeSee pricing

No card. No account.

Related

Frequently asked questions

Do customers prefer fixed quotes?

For planned domestic work, yes — they want a number to compare. That is why your fixed quote must still leave room for normal overrun and clear exclusions.

Should travel be inside the day rate?

Either price travel into the day rate from the start, or show a separate travel/call-out line. Do not discover unpaid driving after the job.

Can I switch from hourly to a fixed quote mid-job?

Yes, once you know the repair. Stop, write the fixed price for the remaining work, and get acceptance before you continue.

Where do materials fit on a day-rate job?

State the markup rule on the quote (for example cost plus 30%, or trade price plus a fixed handling fee) and keep receipts. See the materials markup guide.